Official Architectural Exhibition Board · Plate No. 01

Architectural Presentation Board & Master Synthesis

FEASIBILITY MASTERWORK PROPOSAL

HIGH PARK — THE MOUNTAIN

“A place to enjoy life, today and for future generations.”

Ervin Remus Radosavlevici © 2026
Founder & Creator: Ervin Remus Radosavlevici
© 2026 Ervin Remus Radosavlevici. All Rights Reserved.
Genesis Timestamp: 2025-06-14 12:00:00
Active Feasibility Release: 2026-10-17 00:50:00 UTC (London Time)
Ownership identity: radoscore@icloud.com
High Park Mountain London Sunset View
Ervin Remus Radosavlevici © 2026
Plate 01 · Landscape & London Skyline

Exterior Mountain Elevation at Sunset

The +120m landscaped mountain rising over the London skyline, showing terraced pedestrian walking trails and the illuminated summit saucer.

Mountain Cross-Section Cutaway Showing Shopping Centre Inside
Ervin Remus Radosavlevici © 2026
Plate 02 · Structural Cutaway Section

Multi-Level Shopping Centre Inside The Mountain

Reveals the subterranean shopping and leisure centre with central glass skylight dome, 40m natural waterfall, and foundation piles.

Architectural Master Site Plan
Ervin Remus Radosavlevici © 2026
Plate 03 · Master Site Plan

Circulation, Portals & SuDS Attenuation Ponds

Circular mountain footprint, barrier-free spiraling ramps, emergency access loops, visitor reception plaza, and water retention lakes.

Summit 360 Panoramic Observation Deck
Ervin Remus Radosavlevici © 2026
Plate 04 · Panoramic Experience

Summit 360° London Panoramic Observation Saucer

Unobstructed 360-degree views across London from Windsor to Canary Wharf, with the London Eye and Big Ben in full evening panorama.

Family Nature Discovery and Educational Learning Environment
Ervin Remus Radosavlevici © 2026
Plate 05 · Education & Future Generations

Family Nature Discovery & Biosphere Learning Lab

Terraced indoor-outdoor environmental learning pavilion with living alpine botany, tactile freshwater runnels, and school discovery workshops.

Architectural Masterplan Exhibition Board
Ervin Remus Radosavlevici © 2026
Plate 06 · Master Synthesis Sheet

Masterplan Architectural Exhibition Board

Full competition presentation sheet showing site master plan, cross-section elevations, circular shopping atrium, and sustainability infographics.

01. Biophilic Architecture

Living alpine green exterior slopes supporting 140+ native UK species (+35% BNG). Natural stone cavern interior with 40m waterfall stack cooling.

02. Subterranean Leisure Hub

10 curated lifestyle and cultural categories, educational nature biosphere, acoustic cinemas, boutique arcades, and restaurants.

03. Generational Legacy

1.4m non-climbable safety glass balustrades, 72% free public parkland, closed-loop rainwater recycling, and net-zero energy design.

Master Plan Technical Register

Preliminary feasibility figures · subject to Phase 2 verification
Site footprint

65,000 m² (6.5 ha)

Minimum viable envelope

Summit height

+120 m AOD

Subject to CAA / LVMF review

Vertical levels

7 internal + B1/B2

L+1 to L+5, summit, subterranean

Peak occupancy

15,000 visitors

5.2 min evacuation (BS 9999)

Retail GIA

72,000 m²

10 curated categories

Public open space

72% free slopes

Community Benefit Covenant

Biodiversity Net Gain

+35% BNG

Exceeds Environment Act 2021

Rainwater harvest

95% closed loop

SuDS + attenuation ponds

Construction jobs

6,200

London Living Wage mandated

Operational jobs

4,800 permanent

100% LLW tenant charter

Material haulage

85% by river barge

Thames jetty logistics

CAPEX envelope

£3.20B baseline

Range £2.85B–£3.65B

Master Plan Zoning & Circulation Schedule

Zone A — Public Parkland & Slopes

1:20 gradient barrier-free switchback ramps, sensory quiet zones for neurodiverse visitors, bio-filtered stream terraces, 140+ native species planting, dark-sky compliant low-lux illumination.

Zone B — Retail & Leisure Cavern

7-level subterranean galleria around the 40m waterfall atrium and glass skylight dome; express lift cores, escalator banks, acoustic cinemas, boutique stone arcade (B1).

Zone C — Summit Experience

360° observation saucer with structural glass floor bays, telescope stations, twilight chill gardens with bio-ethanol firepits, 1.4m non-climbable glass balustrades throughout.

Zone D — Service, Logistics & Resilience

Segregated service delivery loops, SuDS attenuation ponds, emergency vehicle access rings, 8 dual pressurized evacuation stair cores (36m total clear width), stack-effect summit smoke purge.

Delivery programme (9 phases · preliminary)

Phase 1 Brief & sites (mo 1–6) → Phase 2 Geotechnical & EIA due diligence (7–18) → Phase 3 RIBA Stage 2 concept & independent feasibility (19–28) → Phase 4 public consultation (29–38) → Phase 5 cost plan & business case (39–48) → Phase 6 statutory planning approvals (49–64) → Phase 7 funding close & contracts (65–74) → Phase 8 construction (75–118) → Phase 9 commissioning & opening (119–126). Full decision-gate detail in the 9-Phase Roadmap section.

Statutory Approval Status Register

Actual status · 2026-10-16

Honest status declaration: HIGH PARK — THE MOUNTAIN is a proposed concept. It is not an existing building and does not yet hold planning permission or any statutory approval. No application has been submitted to any council or authority. Every engineering, electrical, safety and materials specification on this board is a proposed design intent prepared for feasibility discussion, to be verified and approved by qualified professionals and the relevant statutory bodies before anything is built.

Planning permission (LPA)

NOT SUBMITTED

Pre-application advice (Westminster / RBKC)

NOT YET REQUESTED

Environmental Impact Assessment scoping

NOT SUBMITTED

Building Safety Regulator Gateways 1–3

PENDING (Gateway 1 at planning stage)

Land ownership / site control

NO SITE SECURED

Funding committed

NONE — concept stage

Electrical & Building Services Engineering Design

Proposed design intent · BS 7671 & BS EN standards · pending professional verification
Power distribution (proposed)

Dual 11kV primary intake from independent UKPN feeders to two on-site substation rooms (N+1 resilience); twin-run LV busway risers serving all 7 levels; 2×2.5MVA standby CHP generators with 72-hour fuel autonomy for life-safety loads; BS 7671 18th Edition compliant distribution with AFDD and SPD protection throughout.

Life-safety electrical (proposed)

BS 5266 emergency lighting on independent maintained circuits; addressable BS 5839 fire detection with voice alarm (BS 5839-8); pressurised evacuation lift supplies on fire-rated containment; luminaires with 3-hour battery autonomy at all 8 stair cores and escape routes.

HVAC & passive systems (proposed)

40m biophilic waterfall passive evaporative cooling (−35% HVAC load); hybrid ground-source heat pump arrays into Thanet Sand; heat-recovery air handling units per level; stack-effect summit louvers for smoke purge and natural summertime ventilation (CIBSE Guide B verified at Phase 3).

Water, drainage & energy (proposed)

95% closed-loop rainwater harvesting feeding the waterfall and irrigation; SuDS attenuation ponds sized for 1-in-100-year + 40% climate uplift; on-site solar PV skin and micro-wind edge turbines targeted at net-zero operational regulated energy.

Vertical transport & connectivity (proposed)

12 barrier-free express lift cores (BS EN 81-20/50), twin escalator banks per galleria, full step-free routes 1:20; building-wide fibre spine, 5G/4G neutral-host DAS in the cavern (emergency services priority), and full accessibility compliance with BS 8300 and Approved Document M.

Materials schedule (proposed)

Hybrid steel space frame with geofoam fill; reinforced-concrete diaphragm perimeter walls (C40/50); laminated safety glass (BS EN 12600) balustrades and floors; glulam engineered timber pavilions; honey-toned natural stone strata; non-toxic organic finishes in all children’s areas; 100% recycled-content aggregate mountain envelope.

Ownership Protection & Attribution Integrity
Ownership identity: radoscore@icloud.com

UNCHANGED OWNERSHIP DECLARATION: HIGH PARK — THE MOUNTAIN, its master plan, all plates, drawings, and documentation are the original work of Ervin Remus Radosavlevici, Copyright © 2026, All Rights Reserved. This master plan must not be rebranded, renamed, re-attributed, sold, transferred or altered in authorship without the founder’s prior written authorisation executed with a qualified solicitor. The Ownership Integrity Guard verifies this attribution at runtime on every page load and logs a tamper warning if it is altered or removed.

Honest scope: technical measures deter and document tampering but cannot make rebranding legally impossible — binding protection rests on copyright law, contract (including the proposed NDA below) and registered trade marks, enforced through the courts.

PROPOSED CONTRACTUAL NOTICE: £78,000,000,000 PENALTY AND ASSETS CONFISCATED
Genesis: 2025-06-14 12:00:00 · Board revision: 2026-10-16T22:14:00Z (v2.9.0)

Proprietary project concept. Confidentiality and permitted use are subject to a valid written agreement and applicable law.

Legal Advisory: Displayed per founder design specification. Under English contract law (Cavendish Square Holding BV v Talal El Makdessi [2015] UKSC 67), pre-agreed clauses must protect legitimate business interests and not operate as an unenforceable penalty. Any binding NDA or asset security deed requires independent drafting and formal execution with a qualified UK solicitor.

INTERNATIONAL HUMAN RIGHTS LAW & ETHICSDignity · Equality · Safety · Peace · Joy · Future Generations
Ervin Remus Radosavlevici © 2026
HIGH PARK — THE MOUNTAIN. Founder and Creator: Ervin Remus Radosavlevici. Copyright © 2026 Ervin Remus Radosavlevici. All Rights Reserved. Ownership identity: radoscore@icloud.com. Ownership integrity verified.